Work Packages (WP)

The “Green Site” project is divided into 7 actions, which correspond to principal objectives.

1.Project Management

  • 1.1: Management structure;
  • 1.2:Monitoring;
  • 1.3: Audit;
  • 1.4: Contacts with other LIFE+ projects;
  • 1.5: After-LIFE Communication plan.
2. Planning of a plant pilot engineering for the extraction –FSC – CO2 – and oxidation –SCWO – of hydrocarbons from contaminated sediments

  • 2.1: General Engineering;
  • 2.2: Design of the process control subsystem.

3. Pilot plant construction

  • 3.1: Specifications definition ;
  • 3.2: Definition of materials purchase;
  • 3.3: Definition of components purchase;
  • 3.4: Assembly.

4. Technology assessment

  • 4.1: Technical preparation;
  • 4.2: Evaluation.

5.Results

  • 5.1: Monitoring, evaluation results.

6. Communication and dissemination

  • 6.1: Appropriateness of measures envisaged for the dissemination and/or exploitation of project results, and management of intellectual property;
  • 6.2: External communication;
  • 6.3: Final Conference and Twitter page.

7. LCA of the prototype and Carbon Footprint of the decontamination